How To Replace A Single Plank in SPC LVT Or Laminate Flooring
Home » News » Industry Insights » How To Replace A Single Plank in SPC LVT Or Laminate Flooring

How To Replace A Single Plank in SPC LVT Or Laminate Flooring

Views: 0     Author: PROLEADER FLOORS     Publish Time: 2023-04-12      Origin: Site

Inquire

How to Replace a Single Plank in SPC LVT or Laminate Flooring

A single damaged plank does not mean the whole floor needs replacement. With the right technique, one plank can be removed and replaced without affecting the surrounding planks. This guide covers the method for SPC, LVT, and laminate.

When to Replace a Single Plank

Replace a single plank when:

- The surface is deeply scratched or gouged

- The plank is swollen from moisture damage

- A crack or break has formed

- The locking mechanism is damaged

- Permanent staining cannot be removed

If the damage is limited to one plank, replacement takes about 30 minutes for an experienced DIYer.

Tools You Will Need

- Oscillating multi tool with plunge blade

- Utility knife

- Pry bar or flat head screwdriver

- Wood glue or construction adhesive

- Tapping block and mallet

- Vacuum for debris

Method for Interior Rows Not Near Walls

This method works when the damaged plank is several rows away from the wall and you cannot access it from the edge.

1. Use the multi tool to cut the damaged plank down the center lengthwise. Cut through the entire plank but do not cut the subfloor

2. Cut across the plank near each end, about 2 inches from the short edges

3. Use a pry bar to lift and remove the center strip of the damaged plank

4. Remove the remaining pieces near the edges. Angle the pieces up carefully to avoid damaging adjacent planks

5. Vacuum all debris from the exposed area

6. Check the locking mechanism of surrounding planks. If they are damaged, they may also need replacement

Installing the New Plank

1. Cut the tongue off the long edge of the replacement plank that will connect to the existing floor

2. Cut the tongue off the short end that will insert first

3. Apply wood glue or construction adhesive to the tongue of the existing planks that will receive the new plank

4. Insert the new plank at an angle. Lower it into position

5. Weigh down the plank with heavy books or weights for 24 hours

6. Clean any excess glue before it dries

The glue creates a permanent bond. This plank cannot be removed later without cutting.

Method for Planks Near the Wall

If the damaged plank is within 3 rows of a wall, you can reach it by disassembling the floor from the wall edge.

1. Remove baseboards and transition strips near the wall

2. Starting at the wall, lift and disassemble planks row by row

3. Keep planks in order so they can be reinstalled in the same position

4. When you reach the damaged plank, lift and replace it

5. Reinstall the removed planks in reverse order

6. Replace baseboards and transitions

This method takes longer but does not require cutting the damaged plank or using glue.

Precautions

- Wear safety glasses when using the multi tool

- Work slowly around adjacent planks to avoid scratching them

- Check that the replacement plank is from the same production batch for color match

- Keep spare planks from your original installation for future repairs

About PROLEADER

PROLEADER recommends keeping at least 5 percent extra planks from your original order for future repairs. Contact us for matching planks if you need replacements after the original install.

Subscribe to our newsletter